Bulletins
Below are documents that provide an overview of PLI construction procedures, guidance on code-related topics, and code interpretations. Please check back regularly for updates.
Departmental Procedures:
-
PLI Temporary Operations 9/13/2021
-
Accelerated Plan Review Policy 2/17/23
-
License Simplification Policy 5/19/2022
-
Floodplain Permit Policy 10/01/2022 New!
Construction Procedures:
-
TPA Services 5/24/2022
-
2015 Code Deadline and 2018 Code Adoption 11/5/22 Revised!
-
PLI's Guidelines for Temporary Structures During COVID 1/31/2021
-
Standard Permit Application Requirements 4/26/2021
-
Partial/Phased Occupancy Guidelines 5/3/2021
-
Landscaping special inspections 7/5/2016
-
Permit Amendments 7/9/2021
-
Off-Hour Inspections 4/19/2021
-
Pre-fabricated Structures/Components 11/16/2020
-
Private Demolition Procedures 4/27/21
Informational:
- Smoke and Carbon Monoxide Alarms 2/22/2016
-
Accessibility Guidelines 8/6/2020
-
Temporary Structures During COVID 1/31/2021
Code Interpretations:
-
Occupancy of Uncertified Buildings 4/18/2022
-
Work Area Method & Uncertified Buildings 4/18/2022
-
Nonresidential Uses in a Single-family dwelling or Two-family dwelling 2/18/2022
-
Care within a Single-Family Dwelling or Two-Family Dwelling 9/8/2021
-
Domestic Ranges in Commerical Settings 4/28/2021
-
Dwelling Unit AFCI Protection 4/28/2021
-
Mechanical Guard Attachment 4/28/2021
-
Electrical Penetrations of Common Walls 2/10/2021
-
Electrical Services and Common Walls 2/10/2021
-
Townhouse and Attachment 5/21/2016
-
Buildings Crossing Property Lines 5/22/2016
-
Habitable Attics 12/9/2016
-
Horizontal Exits 11/29/2016
-
Performance Compliance and Automatic Fire Detection 8/28/2017